Installed capacity
Sources: SolarPower Europe and IRENA; PVGIS for the yield gap between Plymouth and Glasgow.
The United Kingdom ended 2025 with about 19 to 21 GW of installed solar capacity (sources: SolarPower Europe; IRENA). But the figures that decide a purchase are local and dated: your town's yield, the price cap on your tariff, the SEG rate your chosen supplier actually offers, and the support that genuinely exists today, which for most households who can pay means no grant at all. This page gathers the checked data, with sources and dates, and leads to the UK calculators that use it.
Sources: SolarPower Europe and IRENA; PVGIS for the yield gap between Plymouth and Glasgow.
The 10.8p figure is the average rate offered in Ofgem's Year 5 annual report (April 2024 to March 2025, published December 2025): a market statistic, not a rate you will get. SEG is Great Britain only.
How the SEG worksOfgem price cap, 1 October to 31 December 2026, Direct Debit, including VAT. The next cap period is announced by 25 November 2026. The cap covers Great Britain; Northern Ireland has a separate market.
The same setup everywhere: 5 kWp, south-facing, 35 degree tilt, 14% system loss included. From Glasgow (853 kWh/kWp) to Plymouth (1,122 kWh/kWp) the north to south gap is 32%. Source: PVGIS SARAH3, European Commission JRC, API v5_3, checked 8 November 2026. Monthly shapes use the checked London profile for England and Wales and the checked Edinburgh profile for Scotland and Belfast.
| Town or city | Annual generation at 5 kWp | Generation per kWp | Tilt | Monthly profile |
|---|---|---|---|---|
| London | 5,094 kWh | 1,019 kWh/kWp | 35° | England and Wales (London) |
| Birmingham | 4,840 kWh | 968 kWh/kWp | 35° | England and Wales (London) |
| Manchester | 4,430 kWh | 886 kWh/kWp | 35° | England and Wales (London) |
| Leeds | 4,736 kWh | 947 kWh/kWp | 35° | England and Wales (London) |
| Glasgow | 4,263 kWh | 853 kWh/kWp | 35° | Scotland and Belfast (Edinburgh) |
| Sheffield | 4,734 kWh | 947 kWh/kWp | 35° | England and Wales (London) |
| Liverpool | 4,825 kWh | 965 kWh/kWp | 35° | England and Wales (London) |
| Edinburgh | 4,514 kWh | 903 kWh/kWp | 35° | Scotland and Belfast (Edinburgh) |
| Bristol | 5,115 kWh | 1,023 kWh/kWp | 35° | England and Wales (London) |
| Cardiff | 5,209 kWh | 1,042 kWh/kWp | 35° | England and Wales (London) |
| Belfast | 4,594 kWh | 919 kWh/kWp | 35° | Scotland and Belfast (Edinburgh) |
| Southampton | 5,318 kWh | 1,064 kWh/kWp | 35° | England and Wales (London) |
| Leicester | 4,903 kWh | 981 kWh/kWp | 35° | England and Wales (London) |
| Coventry | 4,933 kWh | 987 kWh/kWp | 35° | England and Wales (London) |
| Plymouth | 5,610 kWh | 1,122 kWh/kWp | 35° | England and Wales (London) |
| Aberdeen | 4,467 kWh | 893 kWh/kWp | 35° | Scotland and Belfast (Edinburgh) |
| Cambridge | 5,204 kWh | 1,041 kWh/kWp | 35° | England and Wales (London) |
| Exeter | 5,261 kWh | 1,052 kWh/kWp | 35° | England and Wales (London) |
Since 1 January 2020 the route to payment for exported electricity is the Smart Export Guarantee (SEG Order 2019). A licensed supplier with at least 150,000 domestic customers must offer at least one SEG tariff; smaller suppliers may volunteer. Rates are set by suppliers, not by the government or Ofgem, and the only floor is above 0p per kWh: there is no official typical rate. Your SEG supplier does not have to be the supplier you buy from. To be paid you normally need an MCS certificate (or equivalent) as proof the installation and installer are certified, a meter capable of half-hourly readings, and an export MPAN. Ofgem administers the scheme and reported for Year 5 (April 2024 to March 2025): £56.97 million paid, 443.1 GWh of exports paid for, 270,395 installations on a SEG tariff, and an average offered rate of 10.8p per kWh. Treat that average as history, not as an offer. The SEG is Great Britain only: Northern Ireland is outside it, and export there is arranged with suppliers outside the scheme. Belfast is still a yield city in the calculators, with this note attached.
Installing energy-saving materials, including solar panels, in residential accommodation is charged at 0% VAT: Great Britain since April 2022, Northern Ireland since May 2023. Batteries joined the relief in February 2024, whether or not they are fitted with the panels. The relief ends on 31 March 2027 and becomes 5% from 1 April 2027; the Autumn Budget 2026 did not extend it. Source: HMRC VAT Notice 708/6.
There is no general grant for solar panels for households who can pay. ECO4 (Great Britain) funds whole-house packages for low-income and vulnerable households and is funded to 31 December 2026, so it is closing soon. The Warm Homes: Local Grant (England only) covers privately owned homes rated EPC D to G with household income usually £36,000 or less, with solar panels a listed measure, delivered to 31 March 2028. Home Energy Scotland and the Welsh Nest scheme run their own offers in Scotland and Wales. Solar Together is group buying, not a grant: you still pay in full. A Warm Homes Loan Scheme exists (GOV.UK, October 2026): it is finance, not funding.
Most rooftop solar on a house in England is permitted development under GPDO Part 14 Class A, as rewritten by SI 2026 No. 896 with effect from 27 August 2026. Listed buildings and conservation areas need extra care. Planning is devolved: Scotland, Wales and Northern Ireland have their own rules, which differ from England's, so check your nation's guidance and your local planning authority. Electrical work in England and Wales must meet Part P of the Building Regulations, normally self-certified by a registered competent person.
In Great Britain, systems up to 3.68 kW per phase connect under G98: install and commission, then notify your distribution network operator within 28 days. Above that threshold, G99 requires the DNO's approval before you connect. The limit is per premises in total, so existing generation plus a new battery can move a home from G98 into G99. Northern Ireland has parallel G98/NI and G99/NI arrangements with NIE Networks.
Unlike Germany, the UK has no plug-in solar regime: there is no socket based route and no simplified registration. A grid-connected system, however small, must be properly installed and notified like any other, under G98 or G99 as its size requires.
The calculators price systems from DESNZ statistics: the median installed cost of MCS-certified installations in Great Britain fitted April 2025 to March 2026 was £1,780 per kW for systems up to 4 kW and £1,697 per kW above 4 kW up to 10 kW (published 28 May 2026). At the small-system median, a typical 4 kW system comes to about £7,100. A median is a benchmark, not a quote: get three quotes for the same specification.
Solar panel calculator for generation, savings and payback in your town. How much do solar panels cost for a 3-bedroom house? for the price by panel count and size band. The Smart Export Guarantee explained for rates, rules and claiming. Solar panel grants in the UK for the honest table of what exists. All 122 tools for UK homes.