Home / Tools / Grants and paperwork / The Smart Export Guarantee explained: rates and rules

The Smart Export Guarantee explained: rates and rules

In the UK: the Smart Export Guarantee, supplier-set rates, MCS proof, a half-hourly export meter and an export MPAN. Great Britain only. For the UK these pages use the checked rules, with source and date on the page. For other countries the tool uses only values you enter: always check the current official terms.

Your figures and assumptions

Yields checked in PVGIS SARAH3 for 18 UK towns and cities: from 853 kWh/kWp in Glasgow to 1,122 kWh/kWp in Plymouth, at 5 kWp, south-facing, 35 degree tilt.
5 kWp
Your household's use over a year, from your bills or meter.
35 °
0 kWh
Prices and costs (sourced, all editable)
Automatic uses the DESNZ median install cost, MCS-certified installations, April 2025 to March 2026: £1,780 per kW for systems up to 4 kW, £1,697 per kW above 4 kW up to 10 kW, £1,262 per kW above that. It switches band with the system size you set. Installed prices include 0% VAT on installation until 31 March 2027, then 5%.
Type the rate from your own quotes if you prefer it to the DESNZ median.
Starting value: Ofgem price cap, 1 October to 31 December 2026, Direct Debit, GB average, including VAT: 26.32p per kWh. Replace it with the rate on your own bill.
Starting value: Ofgem price cap, same period, 54.83p per day. The standing charge is added to the bill whether or not you have solar: 365 days at 54.83p is £200.13 a year.
This field starts empty on purpose: there is no default SEG rate. SEG rates are set by suppliers, not by the government, and the only floor is above 0p per kWh. Enter the rate on your own supplier's SEG tariff. As a guide to what has been offered, Ofgem's Year 5 annual report put the average offered rate at 10.8p per kWh (April 2024 to March 2025, published December 2025): a dated market statistic, not a rate you will get. Leave the field empty and exports are valued at £0.

Every figure can be changed. For a result fitted to your home, use your own tariff and your own quotes.

Editable estimate, used when a battery is included.
Coverage: 18 UK towns and cities, each with a checked PVGIS yield.
Your SEG position for this system
No rate entered
Live result
SEG income a year
£0
Exported energy
3,311 kWh
Average rate offered, Ofgem Year 5 report
10.8p per kWh (statistic only)
Who sets the rate
your supplier
Territory
Great Britain SEG only
Standing charge over the year
£200

The Smart Export Guarantee: how your exports are valued

Under the Smart Export Guarantee (SEG Order 2019), a licensed supplier pays you for metered electricity exported to the grid. The export contract can be with a different supplier from the one you buy from. To be paid you normally need an MCS certificate (or equivalent) for the installation, a meter that can take half-hourly readings, and an export MPAN. The SEG applies in Great Britain only: Northern Ireland is outside the SEG, and export there is arranged with suppliers outside the scheme.

Self-consumed, valued at your unit rate£469
Exported energy3,311 kWh
SEG rateNot entered
SEG income£0
Total annual benefit so far£469

Enter your SEG tariff in the prices section to value your exports. Until you do, exported energy is counted at £0, because there is no standard rate: SEG rates are set by suppliers, not by the government, and the only floor in the rules is above 0p per kWh.

Ofgem, which administers the scheme, reported in its Year 5 annual report (April 2024 to March 2025, published December 2025) that the average SEG rate offered was 10.8p per kWh. That is a dated market statistic about past offers, not a rate you will get: check the current tariff of the supplier you choose. Sources: Smart Export Guarantee Order 2019; Ofgem SEG guidance and Year 5 annual report. Checked 8 November 2026.

To claim SEG payments you normally need an MCS certificate (or equivalent) for the installation, a meter capable of half-hourly readings and an export MPAN. Your SEG supplier does not have to be the supplier you buy electricity from. Northern Ireland is outside the SEG: export there is arranged with suppliers outside the scheme. Sources: SEG Order 2019; Ofgem. Checked 8 November 2026.

Worked example

The same calculation with example values: Plymouth, tilt 30 degrees, other values as in the form.

Your SEG position for this system
No rate entered
Live result
SEG income a year
£0
Exported energy
3,636 kWh
Average rate offered, Ofgem Year 5 report
10.8p per kWh (statistic only)
Who sets the rate
your supplier

How the calculation works

The Smart Export Guarantee (SEG Order 2019) pays for metered exports through a supplier's SEG tariff. Rates are set by suppliers, not by the government; the only floor is above 0p per kWh. You normally need an MCS certificate (or equivalent), a meter capable of half-hourly readings and an export MPAN. SEG is Great Britain only: Northern Ireland is outside it. Ofgem's Year 5 annual report put the average offered rate at 10.8p per kWh (April 2024 to March 2025): a dated statistic, never a promised rate, and this site uses no default SEG rate.

Grants and paperwork: there is no general grant for households who can pay. ECO4 (Great Britain, low-income and vulnerable households) is funded to 31 December 2026. The Warm Homes: Local Grant (England only, EPC D to G, household income usually £36,000 or less, solar a listed measure) runs to 31 March 2028. VAT on installation is 0% until 31 March 2027, then 5%. Most rooftop solar in England is permitted development under GPDO Part 14 Class A as rewritten by SI 2026 No. 896 (in force 27 August 2026); listed buildings and conservation areas need extra care, and Scotland, Wales and Northern Ireland have their own rules. Grid connection: G98 up to 3.68 kW per phase (connect, then notify the DNO within 28 days); G99 needs DNO approval before connecting above that.

Common questions

Is there a grant for solar panels?

Not a general one. ECO4 supports low-income and vulnerable households in Great Britain and is funded to 31 December 2026. The Warm Homes: Local Grant covers England only, homes rated EPC D to G with household income usually £36,000 or less, to 31 March 2028. Solar Together is group buying, not a grant. Everyone qualifying gets the 0% VAT relief on installation (to 31 March 2027) and SEG payments for exports.

Do solar panels need planning permission?

Most rooftop solar on a house in England is permitted development under GPDO Part 14 Class A, as rewritten by SI 2026 No. 896 from 27 August 2026. Listed buildings and conservation areas need extra care. Scotland, Wales and Northern Ireland have their own rules: check your nation's guidance.

What are G98 and G99?

The grid connection routes in Great Britain. Up to 3.68 kW per phase, G98 means connect and then notify your distribution network operator within 28 days. Above that, G99 means you need the DNO's approval before you connect.

Related tools

Solar panel grants in the UK: what actually exists · VAT on solar panels: 0% until 31 March 2027 · Tax on Smart Export Guarantee income · Registering solar panels: MCS, G98 and G99 checklist