Registering a rooftop system involves paperwork everywhere, and the detailed process differs by country and changes over time, so this page states no country's process. What it builds is your preparation checklist: the documents, photos and questions to have ready before you start, tailored to your home, your meter and your system.
Why no country-by-country process here: registration processes genuinely differ, they are revised often, and a checklist that stated a step wrongly would send you to the wrong office with the wrong form. The steps above hold everywhere: documents in hand, meter understood, the operator's current process followed, and the supplier's export treatment in writing.
The same checklist for a renter in Spain with an old analogue meter, a battery and a larger system:
The checklist is assembled from your answers: five steps apply to every rooftop registration, and your tenancy, meter, battery and size answers add the steps those situations genuinely involve. Nothing in it is a legal requirement stated by SunIndex; every step is either a document to keep or a question directed at the body that does set the requirement.
The two bodies are worth keeping separate, because confusing them is the commonest paperwork mistake: the grid operator runs the network and the meter and owns the connection and registration process, while your supplier sells you energy and decides how exports are billed. A rooftop system touches both, and the checklist keeps their questions apart.
Through the current process of your grid operator, the network company named on your bill. Processes differ by country and change, so this page does not state one: it makes sure you start that process with every document, photo and figure already in hand.
Everywhere, the core set is the same kind: the installer invoice and completion certificate, panel and inverter data sheets with serial numbers, and meter details. Your operator's process may ask for more; the checklist keeps the universal core ready so nothing starts from zero.
That is a question for your operator's current process, not a verdict this page can give: connection and metering arrangements can be required by the fact of generation itself. Ask before installation, not after, which is where the question sits in the checklist.
That is common and convenient. Still keep your own complete file, certificates, serial numbers, meter photos and copies of submissions, because the registration attaches to your property and your contract, and installers change, retire and close.